Full property transformations — open concept conversions, complete gut rehabs, structural changes, and full interior rebuilds. Here’s what the work actually involves in Columbus, and what drives the cost.
“Whole home” covers two very different projects. Knowing which one your house needs is the single biggest factor in the budget.
Walls stay where they are and the systems stay in service. New flooring, paint, trim, doors, fixtures, and hardware throughout — sometimes new cabinet faces and countertops. Little to no demolition behind the drywall, minimal permitting, and the house usually stays livable during the work.
Interior stripped to the studs — often including layout changes, structural work, and complete replacement of wiring, plumbing, and HVAC. Everything gets inspected and brought to current code. It costs several times more than a cosmetic refresh, and it is the right call when the systems are at end of life.
A cosmetic refresh can usually be phased room by room while you live in the house. A full gut cannot — once water, power, and heat are disconnected, the house is a construction site. Plan on moving out for the duration and carrying that housing cost in the budget. Partial-gut projects can sometimes be phased by floor (finish the upstairs, move up, then gut the main level), but phasing stretches the timeline and adds mobilization cost each round. It buys convenience, not savings.
A whole-home remodel almost always needs permits: a building permit for structural or layout changes, plus separate electrical, plumbing, and HVAC permits pulled by the licensed trade contractors. Each inspection stage — rough-in, then final — has to pass before the next phase covers the work up.
The rules are similar but not identical — review times, fee schedules, and drawing requirements vary by jurisdiction, which is one reason identical projects price differently across the metro. Your contractor should identify the jurisdiction and carry permit costs in the estimate.
Moving or removing load-bearing walls, changing rooflines, cutting new openings in exterior walls, or repairing foundations generally requires stamped drawings from a licensed structural engineer before a permit is issued. Simple like-for-like replacement work usually does not. Engineering typically runs a small fraction of the project cost but adds lead time up front — more on this in the structural repairs guide.
Much of Columbus — Franklinton, Olde Towne East, Clintonville, the Hilltop, German Village — was built before 1950. Open up the walls and these show up on most projects.
Common in pre-1940s homes. Ungrounded, brittle insulation, and unsafe under modern loads — many insurers won’t cover it. A gut remodel is the cheapest moment you’ll ever have to replace it wholesale.
Galvanized pipe corrodes shut from the inside; older service lines may be lead. Both mean low pressure, discolored water, and full repipe scope — plus a new water service if the lead line runs to the street.
Plaster is heavy, cracks with structural movement, and hides framing surprises. Patching it well is skilled work; on a gut remodel it comes down entirely — which adds real demolition and disposal tonnage to the budget.
Pre-1978 homes are presumed to contain lead paint — renovation must follow EPA RRP containment rules. Asbestos shows up in pipe wrap, flooring, and siding, and abatement by a licensed crew must happen before demolition.
In a whole-home remodel, the kitchen and bathrooms are routinely a third to half of the total — they carry the cabinetry, tile, stone, and the densest concentration of plumbing and electrical work. The detailed numbers for those rooms live on the sister sites: see Columbus Kitchen Cost for kitchen remodel pricing and Columbus Bath Cost for bathroom pricing. Use those figures as the kitchen/bath line inside your whole-home budget.
Finally, carry a contingency. On older Columbus homes, 10–15% is a floor, not a ceiling — and on vacant or distressed properties it should be higher still (see the zombie property guide).
A whole-home remodel touches every trade below. One early decision shapes the whole project: hire a single general contractor to coordinate all of it, or act as the coordinator across separate contractors — the first carries overhead cost, the second carries the scheduling risk and the permit responsibility.
Load-bearing wall removal, I-beam installation, open concept conversions, additions. This is the scope that requires stamped engineering drawings and structural permits.
Electrical, plumbing, and HVAC — updated to current code. Critical on older Columbus homes where outdated systems drive up costs and risk.
Knob-and-tube replacement, repiping, plaster demolition, and coordination of licensed asbestos abatement and lead-safe work practices.
Flooring, paint, trim, cabinetry, tile — everything through final walkthrough. Substantial completion means the space is clean and ready to occupy.